Technical collaboration · Manufacturing · fitting

A furniture partner for architects, designers and contractors

Architects, interior designers, renovation firms and operators can involve us at the point where design information needs to become buildable furniture.

Custom-made professional furniture for a workspace
From plan to fittingOne point of contact to coordinate the scope of the furniture
Do you already have drawings or a written specification?

We review feasibility before pricing

Send us the available documentation, location, units and target date

Collaboration capacity

What we contribute to the development of the project

The scope can begin with a defined design or with a still open need. We confirm what documentation exists and what decisions are missing before manufacturing

01

Technical review

Plans, dimensions, exploded views, junctions, installations, access and fitting conditions

02

Manufacturing development

We adjust construction solutions, thicknesses, machining and hardware to the intended use

03

Coordinated production

Manufacturing according to documentation and finishes validated before starting

04

Delivery and installation

We plan delivery, access, fitting, adjustments and review of installed parts

Collaboration formats

A different answer for each type of project

The dialogue, level of detail and planning change depending on who coordinates the work and how the furniture must be delivered.

01

Architects and interior designers

We turn the design intent into a solution that can be measured, manufactured and installed to the agreed detail

  • Review of plans, elevations and junctions
  • Construction and hardware alternatives
  • Samples and finishing before producing
  • Coordination with the wider project team
02

Renovation companies

We integrate the custom carpentry into the renovation schedule and review the conditions before fitting

  • Technical space measurement
  • Review of installations and finishes
  • Manufacturing and delivery dates
  • Fitting coordinated with other trades
03

Developers and construction companies

We organize typologies, units and phases to be able to value the furniture with a comparable and documented scope

  • Review of units and typologies
  • Repeatable finishes and solutions
  • Budget organised by scope
  • Phased delivery planning
04

Hotels and apartments

We assess furniture projects for rooms and common areas based on frequent use, cleaning and maintenance.

  • Rooms and shared areas
  • Materials according to intensity of use
  • Typologies for various units
  • Access and fitting with planned activity
05

Shops and franchises

We study commercial furniture that combines display, storage, brand image and real conditions of the premises

  • Counters, displays and storage
  • Adaptation of a defined identity
  • Easy to maintain materials
  • Implementation and fitting on site
06

Real estate agencies

We propose solutions for homes intended for sale or rent according to the typology, use and planned investment.

  • Pilot or ready-to-rent homes
  • Solutions by room or group
  • Maintenance-oriented finishes
  • Survey, manufacture and fitting
An adapted reviewDoes your project not fit exactly into one of these profiles?

Tell us who coordinates the work, what furniture you need and what documentation exists. We will review the case by scope, not by label

Discuss the project
Professional process

Clear decisions before going into production

Each milestone reduces uncertainty and leaves a record of what is manufactured, how it is finished and under what conditions it is installed.

  1. 01Initial documentation

    Plans, measurements, units, finishes, location and planned schedule

  2. 02Review and scope

    Technical queries, exclusions, alternatives and outstanding information

  3. 03Validation

    Final measurements, samples, hardware, details and fitting conditions

  4. 04Production and delivery

    Manufacture, control, delivery, installation and agreed adjustments

Documented Scope

What do we need to prepare an review

It is not necessary for all documentation to be closed. We review what is available and point out exactly what information is missing to continue

01Type of furniture and units

What parts should be manufactured and if there are repeated typologies

02Plans or measurements available

Plan, elevations, details or approximate dimensions for a first review

03Materials and references

Prescribed finishes or visual references to propose a viable equivalence

04Location and calendar

town or area, access routes, phase of work and target installation date

Before collaborating

Common questions from professionals

The final scope is confirmed after reviewing the documentation and actual project conditions

Can you work from studio plans?

Yes. We review the documentation, detect manufacturing doubts and confirm details, materials, fittings, measurement and fitting before assessing the final scope

Can you help develop a solution that is not yet closed?

Yes, as long as it is defined what part of the development we assume. We can propose constructive solutions and materials compatible with the use and the planned investment.

Do you work in phases or with several units?

Yes. We need to know typologies, quantities, location, delivery sequence, storage and installation conditions

What is confirmed before manufacturing?

Measurements, configuration, materials, finishes, fittings, relevant junctions, economic scope and transport and installation conditions

A project grounded in the property

From room photographs to decisions the workshop can use

No two addresses present the same combination of walls, light, access and daily routines. These are the conversations that make a professional furniture package specific to the property rather than a variation on a standard product.

01

Begin with what is not working

Start with current drawings, finish intent, programme dates and known access constraints. We are listening for the information already resolved, the decisions still open and the point at which the site will be ready. A polished specification can come later; at this stage, a candid description is usually more useful.

A short list of must-haves and nice-to-haves keeps the early conversation honest. It also gives the quotation somewhere sensible to flex.

02

Geometry becomes useful when the brief is clear

Older walls are rarely perfect and recent renovations can hide their own surprises. The measured visit records the useful irregularities, not merely the largest number on each wall.

Ceiling drops, skirting, sockets and door swings are easy to miss in a plan. They are recorded where they affect the furniture and ignored where they do not.

03

Choose from a shortlist, not a wall of samples

A convincing sample is one that still makes sense beside the floor, doors and light that will remain. We also confirm what supports it, how edges are finished and which hardware carries the load.

If two options are genuinely equivalent for the brief, we say so. Material advice should reduce uncertainty, not invent distinctions to justify a longer specification.

04

The route into the room shapes the furniture

For an address in Pilar de la Horadada, we confirm how protected parts will move from the vehicle to their final position. This can change carcass divisions while leaving the visible composition calm.

Parking restrictions or a long carry do not automatically rule out the project. They do need an agreed plan, enough people and protection prepared before the parts arrive.

05

The budget follows the agreed scope

Phasing can be sensible, particularly when several rooms are involved. What matters is deciding the sequence before one early choice limits a later room.

For a professional furniture package, we can identify the decision that drives most of the cost and explain it before smaller choices distract from the total.

06

A useful enquiry earns a useful reply

The aim of the first exchange is simple: give the project a sensible direction without manufacturing certainty that does not yet exist.

Once the direction is agreed, we can discuss timing with more honesty. Lead time follows the approved scope, material availability and conditions at the property.

Professional consultation · Pilar de la Horadada

Tell us what you need to manufacture

Share plans, units, location and target date. We will tell you the next step